376-252A LNER Thompson Second Corridor BR Maroon E1435E option-set-109 meetings and district managers’ tours
Description
meetings and district managers’ tours of network
the vehicle is decorated in Post Office red with silver roof
Braking with DCC brake generators or with DC is also possible
with toilet retention tanks and other modifications to operate over the third-rail network
you can be sure of a performance to match too
376-252A LNER Thompson Second Corridor BR Maroon E1435E option-set-109 meetings and district managers’ toursEntering traffic just after World War Two, the Thompson coaches were the last mainline corridor coaches to be built by the LNER, and indeed examples continued to be outshopped after Nationalisation in 1948. Utilising steel panelling, a departure from the teak panelling traditionally seen on coaches built by the LNER and its predecessors, the Thompson coaches were sleek and modern in appearance. Whilst much of the fleet would remain in service until
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
























![Sanrio Characters Pukkuri Rubber Mascot Gummy [2.Cinnamoroll x Milk]](https://cdn.shopify.com/s/files/1/0411/1102/7877/products/bs-4qgl000v2r-002.jpg?v=1663316189)